Road resurfacing works will take place on Eliza Place between Springbank Road and Panorama Drive from 19 October to 13 November 2026.
Toggle dismiss alert

Works will include removal of the existing road surface, laying new bitumen seal, service cover adjustments and line marking reinstatement.

Expect temporary traffic management, reduced speed limits, short delays and some noise during works. On-street parking will not be permitted within the work zone. Property access will be maintained wherever practicable.

We appreciate your patience while these essential road maintenance works are carried out.

Dismiss alert
  • Play equipment Play equipment
  • Fenced equipment Fenced equipment
  • Picnic area Picnic area
Facility type: Park
Features: Community hall; Park; Picnic Tables; Play area fenced; Playground

Reserve Features

  • Community hall
  • Park Picnic tables
  • Drink tap

Playground

  • Fenced play area
  • Accessible 3-bay swings (junior and 'pod' swings)
  • Twin see saw
  • Adventure multi-play unit
  • Single springer
  • Toddler slide
  • Junior slide
  • Play panels
  • Swing bridge
  • Climbing element
  • Play stations
Getting there:
1 Burnell Drive
Belair SA 5052